Frank R. Conwell 
Middle School

Frank R. Conwell School is a three-story, 117,939 square foot building built in 2006. Spaces include classrooms, offices, library, gymnasium, locker rooms, auditorium, cafeteria, kitchen, hallways, lobbies, stairwells, restrooms, storage rooms, and electrical and mechanical space.
Lighting is provided mainly by linear fluorescent T8 fixtures and compact fluorescent lamps (CFL). The facility has three hot water boilers and two air-cooled chillers that provide heating and cooling to spaces. There are seven air handling units (AHU), each serving a different area in the building. The building has two natural gas generators to provide emergency backup electricity. There is one passenger elevator in the building.

Picture7.png

Energy Conservation Measures

Below is a brief description of each of the 37 ECMs

LED.jpg

LED Lighting Replacement

Replace existing lighting with new LED Lighting

boiler.jpg

Boiler Replacement

Replace old boilers with new, high-efficiency boilers

Occ.png

Install Occupancy Lighting Sensor Controls

Install Occupancy Sensors to turn lighting on/off based on need

fuel.png

Fuel Conversion

Replace Oil fired heating systems with new, Natural Gas fired heating systems

highlow.jpg

Install High/Low Lighting Controls

Control lighting levels based on need to save energy

PPA.jpg

Solar PPA

Generate electricity on site for cost savings

Roof.png

Roof Renovations

Renovate older roofing and realize new 15 year warranty

education.jpg

Student Education Program

Involve students and the community in the district energy project

controls.jpg

District-Wide Energy Management System

Replace existing pneumatic controls with new open-protocol controls

chiller.png

Chiller Replacement

Replace old chillers with new, high-efficiency chillers

envelope.png

Building Envelope

Improve comfort and reduce infiltration

vfd.jpg

Install VFDs on Constant Volume Fans

Reduce fan speeds to save energy

vfd.jpg

Premium Efficiency Pump Motors & VFDs

Replace old motors with new, high-efficiency motors w/ VFDs

VFDs.png

Install VFDs on Process Pumps

Reduce pump motor speeds to save energy

VFDs.png

Install VFDs on Heating/Chilled Water Pumps

Reduce pump motors speeds to save energy

pipe.png

Pipe Insulation

Improve existing pipe insulation to prevent heat loss and save energy

vfd.jpg

Install VFDs on Kitchen Hood Fan Motors

Reduce fan speeds to save energy

acunits.jpg

Install High Efficiency Air Conditioning Units

Generate electricity on site for cost savings

gaswaterheater.jpg

Install High Efficiency Gas-Fired Water Heater

Generate hot water on site more efficiently

ecmmotors.png

Refrigerator/Freezer Case Electrically Commutated Motors

ECM Motors make refrigerators/freezers more efficient

lowflow.jpg

Install Low Flow DHW Devices

Conserve water consumption

walkins.jpg

Refrigeration Controls

Operate refrigeration systems more efficiently

Refrigerated Goods

Food Service Equipment Replacement

Replace old cooking equipment with new, high efficiency equipment

Image by Erik Mclean

Replace Refrigeration Equipment

Replace old refrigeration equipment with new, high efficiency equipment

vending.jpg

Vending Machine Control

Operate vending machines more efficiently

furnace.jpg

Install High Efficiency Furnaces

Replace old furnaces with new, high efficiency furnaces

heatpump.png

Heat Pump Replacement

Replace old heat pumps with new, high efficiency heat pumps

poolcover.png

Automatic Pool Cover

Reduce water and heat loss in pools with automatic covers

Sun through the Branches

Indoor Air Quality and Bi-Polar Ionization Cleaners

Improve the learning environment and air quality

heatpumpwater.png

Install Heat Pump Water Heater

Replace old hot water generating equipment with new, high efficiency heat pump water heaters

dcv.jpg

Implement Demand Control Ventilation

Ventilate buildings based on CO2 levels

arris.jpg

Arris Wind & Solar Lighting

Solar powered outdoor lighting

RCx.jpg

Retro-Commissioning Study

Review and address older systems that are too expensive to replace

addventilation.jpg

Add Ventilation & HVAC

Address schools that do not currently have classroom ventilation systems

UV.png

Unit Ventilator Replacement

Replace old classroom HVAC units with new, higher efficiency units

chp.png

Combined Heat & Power

Generate electricity on site with natural gas fired generators